Eydon Lane planned closure from 24th to 28th April

Dear All,

TMO Highways are requiring to install a new water connection on a section of the above road.  To undertake this safely will require that the road is closed from the 24th to 28th April 2017.

A plan showing the closure and diversion can be viewed here https://roadworks.org?tm=109580

If you require any further information about the works please contact Ashley Smith on 01379 676462.

Regards

Gary Thorp

Regulations Team Leader

Northamptonshire Highways

Highways Depot, Harborough Road, Brixworth, Northamptonshire, NN6 9BX

Tel: 01604 651072

Email: gthorp@kierwsp.co.uk

 

This entry was posted in News. Bookmark the permalink.